ALPHA GEN.CO
Bathroom Remodeling in Midland & Odessa
Alpha General Construction manages complete bathroom renovations with clearly defined scopes, coordinated trades, durable waterproofing systems, quality finishes, and consistent communication from planning through completion.
Properly Waterproofed. Professionally Managed.
What’s Included in a Complete Bathroom Remodel
-
• Demolition and preparation of the existing bathroom
• Cement backer board in wet areas
• Reinforced seams and penetrations
• Waterproofing system applied according to the project design
• Shower pan or liner preparation, curb construction, and flood testing when applicable
• Tile installation, grout, sealant, and finish detailing
-
A complete bathroom remodel may include demolition, framing, plumbing, electrical, drywall, waterproofing, tile, flooring, vanity installation, countertops, fixtures, lighting, trim, painting, shower glass coordination, and final completion work. The exact scope is defined for each project before construction begins.
-
Most complete bathroom renovations require approximately 6 to 12 weeks of active construction after selections, materials, and scheduling are finalized. Custom glass, specialty tile, plumbing changes, inspections, or unexpected existing conditions may extend the timeline.
Tile, grout, plumbing fixtures, lighting, mirrors, cabinetry, countertops, hardware, and other finish selections should be finalized before construction whenever possible.
Bathroom Remodeling FAQs
-
Yes. Custom shower glass is typically measured, fabricated, and installed by a specialty glass provider after the tile and surrounding finishes are complete. Alpha coordinates the schedule and required site conditions.
-
Yes, when the existing structure, plumbing, drainage, ventilation, and available space allow it. Relocating fixtures can significantly affect scope, cost, and timeline, so feasibility is evaluated before the work is finalized.
-
Most complete bathroom renovations require approximately 6 to 12 weeks of active construction after selections, materials, and scheduling are finalized. Custom glass, inspections, plumbing changes, specialty materials, or unexpected existing conditions may extend the timeline.
-
Most complete bathroom renovations require approximately 6 to 12 weeks of active construction after selections, materials, and scheduling are finalized. Custom glass, inspections, plumbing changes, specialty materials, or unexpected existing conditions may extend the timeline.
-
Alpha provides a one-year workmanship warranty, subject to the project agreement and warranty terms. Manufacturer warranties apply separately to fixtures, materials, appliances, and specialty products.
Ready to Start Your Bathroom Project?
Tell us about the bathroom you are planning, the existing conditions, your priorities, and your preferred timeline.
We will review the information and determine the appropriate next step.
