ALPHA GEN.CO
Kitchen Remodeling
in Midland & Odessa
Thoughtfully Planned. Professionally Managed.
Alpha General Construction manages complete kitchen renovations with clearly defined scopes, coordinated trades, quality cabinetry, and consistent communication from planning through completion.
-
• Solid maple or beech cabinetry for painted finishes
• Blum soft-close drawers and hinges
• Professional primer and Sherwin-Williams Emerald Urethane enamel finish
• Shaker-style cabinetry as the standard, with custom door styles available
• Optional upgrades such as organizers, pocket doors, lift systems, and specialty storage
-
A complete kitchen remodel may include demolition, layout modifications, framing, drywall, electrical, plumbing, cabinetry, countertops, backsplash, flooring, lighting, appliance coordination, trim, painting, and final completion work. The exact scope is defined for each project before construction begins.
-
Most complete kitchen renovations require approximately 8 to 16 weeks of active construction after selections, materials, and scheduling are finalized. Larger structural changes, custom materials, permitting, or unexpected existing conditions may extend the timeline.
What’s Included in a Complete Kitchen Remodel
Plan Your Kitchen Investment
Before Construction Begins
Use our kitchen planning worksheet to organize priorities and estimate how your investment may be distributed across cabinetry, countertops, backsplash, flooring, plumbing, electrical, fixtures, and appliances.
Kitchen Remodeling FAQs
-
Decorative cabinet hardware is selected and priced based on the homeowner’s chosen style and finish. Alpha coordinates installation, but the exact hardware allowance or owner-supplied responsibility will be identified in the project scope.
-
Yes. Layout changes may include relocating cabinetry, appliances, plumbing, electrical, walls, or adding an island. Feasibility and cost depend on the existing structure, utilities, clearances, and the final design.
-
Yes. Kitchen projects may include recessed lighting, pendants, undercabinet lighting, switches, outlets, appliance circuits, and other electrical modifications. Electrical work is completed by qualified trades and defined in the project scope.
-
Countertops are typically templated, fabricated, and installed by a specialized countertop provider after the cabinetry is installed and verified. Alpha coordinates the schedule and related project requirements.
-
Appliance coordination depends on the specific project and appliance type. The scope will identify whether Alpha is disconnecting, relocating, installing, or coordinating appliances and whether licensed plumbing or electrical work is required.
-
Cabinetry, countertops, tile, plumbing fixtures, lighting, appliances, flooring, and finishes should be finalized before construction whenever possible. Early selections reduce delays, pricing changes, and last-minute design conflicts.
Trusted Project Partners
Yates Flooring Center — tile, backsplash, flooring, countertops
Ferguson Enterprises — fixtures, sinks, faucets, lighting, LED mirrors, tubs
The Window Source of West Texas - Windows & Doors
Alpha coordinates with established local suppliers and specialty providers to support material selections, ordering, fabrication, and installation throughout the remodeling process.
